Premier Energy Solutions, Inc.

Home/Generators/Automatic standby

Whole-house standby, start to finish.

A standby generator sits outside, tied into your natural gas or propane line, and switches your home over automatically — no cords, no starting it yourself, no waiting in the dark while you figure out where you put it last winter.

Nine steps. We run all of it.

Nine steps from first visit to first start. Once work begins, most projects wrap up in about two weeks.

  • Plan Site visit, project manager check-in, permits
  • Install Site work, electrical work, gas work
  • Finish Site restoration, final inspections, start-up
  1. Plan

    Before anything is dug

    1. Site visit

      We walk the property, size the generator and pick the spot. Free.

    2. Project manager check-in

      Your project manager introduces themselves, confirms the plan and answers questions.

    3. Permits

      We pull the permits your town requires.

  2. Install

    Most installs take one to two days on site

    1. Site work

      Set the pad or stand and trench for the gas line and wiring.

    2. Electrical work

      Install the transfer switch and wire it to your panel.

    3. Gas work

      Run the gas line from your meter or tank to the generator.

  3. Finish

    Inspections and hand-off

    1. Site restoration

      We put your yard back the way we found it.

    2. Final inspections

      The town inspects and signs off on the work.

    3. Start-up

      We start it up, test the switchover and show you how it works.

Total backup power for as low as $140/month*.

*Based on $13,000 financed for 15 years at 9.99% APR. $500 deposit. Subject to credit approval through Service Finance Company.

Two ways to pay for it, and the right one is whichever suits how you would rather do it. The rate, the term and what you qualify for are all set out on the financing page.

What size, and what it costs.

Sizing is a load calculation, not a guess from square footage. The estimator gets you a range in about fifteen seconds; the site visit sets the number.

Instant price estimator · Generators About fifteen seconds

Get your instant price

Three questions, then a real range — on this page, in about fifteen seconds.

  • No email address and no phone number to see your range
  • A range for the installed job, not a list price for the unit
  • Your contact details are sent only if you ask for the follow-up

If you’re taking three estimates this week, take ours last.

We’ll tell you what the job actually needs — and what it doesn’t. That starts with sizing it to your house, not the biggest unit on the truck. A whole-home system and one that covers the essentials are both good answers, depending on what has to keep running when the power goes out.

You’ll also see what the quote covers: the generator, the transfer switch, the electrical and gas work, the pad or stand (raised if you’re in a flood zone), permits and inspections. Nothing gets added after you sign.

And when you compare, ask who’s servicing it in five years. We’ve been doing this since 1992, we’re a Generac Elite Plus and Kohler Titanium dealer, and we maintain what we install.

Financing either way: 18 months at 0%, or as low as $140/month* over 15 years. See the options.

*Based on $13,000 financed for 15 years at 9.99% APR. $500 deposit. Subject to credit approval through Service Finance Company.

24/7 generator service (508) 305-7947 Get your generator price